Before arriving
- Accès réservé
- Self-service 24/7
- Bank card payment not confirmed
Drivers using Marie Curie may appreciate its position near Garibaldi, where transport links and charging infrastructure work together.
Being close to Garibaldi places this charging station in an environment shaped by passenger movement and transport connections. That context adds useful information beyond technical specifications.
With charging power up to 22 kW, this station is suitable for a wide range of charging needs.
Charging close to a transport hub often serves different needs than destination charging. Understanding both the technical features and the surrounding context helps drivers make better decisions.
The map helps locate the charger, nearby services and useful road access signals before the stop.
Quickly start directions to the station with the navigation app you already use on the road.
Power helps estimate whether the charge is likely to be short, intermediate or longer depending on the vehicle.
The access information helps determine whether the charger is public, private or restricted.
Payment information may vary by operator and by available source data.
Source opening hours are useful, but checking availability before a long trip is still recommended.
This data helps identify whether the location is suitable for drivers who need accessible access.
93400 Saint-Ouen-sur-Seine
This summary highlights the available connectors and payment methods while keeping the complete station information available below.
Marie Curie fits a destination top-up use case. The enhanced AC charging profile should be compared with available time and nearby services.
Marie Curie lists Type 2. This setup generally corresponds to AC charging, to compare with the maximum power of 22 kW kW.
The station is listed as paid or using another payment method. An app, RFID badge or operator checkout flow may be required.
Check the known payment methods, available prices and reservation conditions for this charging station.
Free: n/a . Pay per use: Yes . Bank card: n/a . Other payment methods: n/a .
The station record does not indicate that reservation is required for this charger.
Nearby services make the stop easier to understand: food, shopping, parking or fuel services around the charger.
These nearby stations help compare distance, charge point count and available power levels around this location.
n/a
27, rue Jules Vallès 93400 Saint-Ouen-sur-Seine
View this stationn/a
5-17, rue Eugène Berthoud
View this station93400 Saint-Ouen-sur-Seine
2 Rue des Entrepôts 93400 ST OUEN SUR SEINE (93) Île-de-France FRANCE
View this station30 Avenue de la Porte de Clignancourt 75018 Paris
View this station32 Avenue de la Porte de Montmartre 75018 Paris
View this station1 Rue Fernand Labori, 75018 Paris
View this station93400 Saint-Ouen-sur-Seine
35 Rue Louis Blanc 93400 ST OUEN SUR SEINE (93) Île-de-France FRANCE
View this station93400 Saint-Ouen-sur-Seine
9 Rue Lafontaine, 93400 Saint-Ouen-sur-Seine
View this station29 Avenue de la Porte de Saint Ouen, 75017 Paris
View this station53 207 residents
332 m
12 technical charge point(s) are attached to this station.
FRPKGE93400001101
FRPKGE9340000111
FRPKGE93400001111
FRPKGE93400001121
FRPKGE9340000121
FRPKGE9340000131
FRPKGE9340000141
FRPKGE9340000151
FRPKGE9340000161
FRPKGE9340000171
FRPKGE9340000181
FRPKGE9340000191
Nearby stations with a similar charging profile and local context.
Saint-Denis
Saint-Denis
Saint-Denis
Saint-Denis
Open related pages for this station: city, department or useful guides.
These answers help drivers prepare the charging stop before getting there.
Marie Curie lists a maximum power of 22 kW. Compare this value with your vehicle, available time and battery level when planning the stop.
The local context mentions Au Petit Navire. These landmarks help plan a break, errand or meal while charging.
Yes, the page brings together the main criteria for charging à Saint-Ouen-sur-Seine: power, access, address, map, nearby services and available charge points.
Before leaving, compare the advertised power, the number of charge points (12), access conditions and services around the station.