Before arriving
- Accès libre
- Self-service 24/7
- Bank card payment not confirmed
For charging in Orville, this station is not defined by power alone. Its proximity to Rocade Minière ties it to a motorway corridor logic that may matter when choosing where to charge.
The landmark Rocade Minière places this station in a clearly readable motorway corridor context. That complements technical data by describing the immediate charging environment.
A maximum output of 120 kW makes it easier to compare this charging station with other nearby options.
For drivers, a charge stop connected to motorway corridor does not follow exactly the same logic as pure destination charging. This page is meant to make that difference more visible.
The map helps locate the charger, nearby services and useful road access signals before the stop.
Quickly start directions to the station with the navigation app you already use on the road.
Power helps estimate whether the charge is likely to be short, intermediate or longer depending on the vehicle.
The access information helps determine whether the charger is public, private or restricted.
Payment information may vary by operator and by available source data.
Source opening hours are useful, but checking availability before a long trip is still recommended.
This data helps identify whether the location is suitable for drivers who need accessible access.
62640 Orville
This summary highlights the available connectors and payment methods while keeping the complete station information available below.
With up to 120 kW, Montigny en Gohelle is mainly suited to a road-trip stop. A 30 to 60 minute stop is often enough for a useful top-up, depending on charger availability, vehicle capability and battery level.
Connector details for Montigny en Gohelle are not sufficiently documented in the source data. It is safer to check the operator or charging app before travelling.
The station is listed as paid or using another payment method. An app, RFID badge or operator checkout flow may be required.
Check the known payment methods, available prices and reservation conditions for this charging station.
Free: No . Pay per use: Yes . Bank card: No . Other payment methods: Yes .
The station record does not indicate that reservation is required for this charger.
Nearby services make the stop easier to understand: food, shopping, parking or fuel services around the charger.
These nearby stations help compare distance, charge point count and available power levels around this location.
62640 Montigny-en-Gohelle
15 Boulevard Salvador Allende
View this station62640 Montigny-en-Gohelle
Boulevard Salvador Allende 15, 62640, Montigny-en-Gohelle
View this station62110 Hénin-Beaumont
Square Ilot Carnot, 62110 HENIN BEAUMONT
View this station62110 Hénin-Beaumont
Parking de le Gare SNCF, 62110 HENIN BEAUMONT
View this station1 Place Tamboise, Rouvroy 62320 France
View this station62710 Courrières
ZAL du Chemy, 2 Rue du Dr Laennec 62710 CourriÇùres
View this station4 Rue d'Artois, Fouquières-lès-Lens 62740 France
View this station890 Bd Fernand Darchicourt, 62110 H..., Hénin-Beaumont 62110 France
View this station62710 Courrières
Espace Valauto zone du rond-point, 62710 Courrières
View this station360 residents
2.2 km
2 technical charge point(s) are attached to this station.
FRLDLE00007122
FRLDLE00007123
Nearby stations with a similar charging profile and local context.
Montigny-en-Gohelle
Courrières
Courrières
Courrières
Hénin-Beaumont
Hénin-Beaumont
Open related pages for this station: city, department or useful guides.
These answers help drivers prepare the charging stop before getting there.
Montigny en Gohelle lists a maximum power of 120 kW. Compare this value with your vehicle, available time and battery level when planning the stop.
The local context mentions Lidl. These landmarks help plan a break, errand or meal while charging.
Yes, the page brings together the main criteria for charging à Orville: power, access, address, map, nearby services and available charge points.
Before leaving, compare the advertised power, the number of charge points (2), access conditions and services around the station.