EV charging station
Operator ENGIE Vianeo

EV charging station near axe principal de Les Tourrettes in Les Tourrettes

For charging in Les Tourrettes, this station is not defined by power alone. Its proximity to axe principal de Les Tourrettes ties it to a motorway corridor logic that may matter when choosing where to charge.

Accès libre Self-service 24/7 Bank card payment
Access

Before arriving

  • Accès libre
  • Self-service 24/7
  • Payment by bank card available
Nearby

During the stop

  • 1 restaurants nearby
  • 9 parking areas nearby
  • 3 hotels nearby
Context

Around the station

  • Useful for a route stop
Overview

About this station

The landmark axe principal de Les Tourrettes places this station in a clearly readable motorway corridor context. That complements technical data by describing the immediate charging environment.

Actual charging speed depends on both the station's maximum power of 22 kW and your vehicle's capabilities.

For drivers, a charge stop connected to motorway corridor does not follow exactly the same logic as pure destination charging. This page is meant to make that difference more visible.

Local SEO

SEO summary

Summary
Services proches : 1 restaurant, 1 station-service, 9 parkings.
Dominant context
mixed
SEO score
34.15
charging_station parking restaurant hotel fuel toilets motorway residential
Map

Location and access

The map helps locate the charger, nearby services and useful road access signals before the stop.

Directions

Open this station in a navigation app

Quickly start directions to the station with the navigation app you already use on the road.

Practical info

Power, access and usage

Maximum power 22 kW

Power helps estimate whether the charge is likely to be short, intermediate or longer depending on the vehicle.

Access Accès libre

The access information helps determine whether the charger is public, private or restricted.

Payment Bank card

Payment information may vary by operator and by available source data.

Opening hours Self-service 24/7

Source opening hours are useful, but checking availability before a long trip is still recommended.

Accessible parking Réservé PMR

This data helps identify whether the location is suitable for drivers who need accessible access.

Address Rue de Berianne 650, 26740 Les Tourettes

26740 Les Tourrettes

Compatibility

Connector compatibility

This summary highlights the available connectors and payment methods while keeping the complete station information available below.

Suggested use

ENGIE Vianeo - B&B HOTEL MONTÉLIMAR NORD fits a destination top-up use case. The accelerated charging profile profile should be compared with available time and nearby services.

Use case
long-distance travel stop
Stop type
top-up during errands
Indicative time
Charging for 1 to 3 hours may provide practical driving range

Available connectors

ENGIE Vianeo - B&B HOTEL MONTÉLIMAR NORD lists Type 2. This setup generally corresponds to AC charging, to compare with the maximum power of 22 kW kW.

domestic socket Not indicated
Type 2 Available
Combo CCS Not indicated
CHAdeMO Not indicated
other connector Not indicated

Payment and reservation

Pay-per-use charging is indicated, with bank card payment available. This is usually the clearest setup for occasional drivers, subject to operator conditions.

Pricing

Payment and reservation

Check the known payment methods, available prices and reservation conditions for this charging station.

Payment methods Pay-per-use charging

Free: No . Pay per use: Yes . Bank card: Yes . Other payment methods: Yes .

Reservation required No reservation indicated

The station record does not indicate that reservation is required for this charger.

Indicative pricing inferred from source text. Please verify with the operator.
Station data

Detailed station data

Identity

Station roaming ID
FRVIAP122068
Local station ID
122068
Developer
ENGIE Vianeo
Source organization
qualicharge

Access and usage

Installation type
Station dédiée à la recharge rapide
Source hours
24/7
Size restriction
Que du poids léger
Two-wheel vehicles
Yes
Connection type
Direct

Payment and connectors

Technical and source

PDL number
50020769855668
Commissioning date
2024-08-09
Last update
2026-06-15
Last source modification
2026-07-26T17:39:23+02:00
Source dataset
6818bce2d9af175f6e01a1b2
Source resource
8bb0a6e2-1016-42ba-aaee-f72f55c82e9f
Nearby services

What can you do while charging?

Nearby services make the stop easier to understand: food, shopping, parking or fuel services around the charger.

Restaurants 1 restaurant Within 500 m
  • Le Mas de Berianne Restaurant 150 m
Service stations 1 service station Within 1 km
  • TotalEnergies 533 m
Hotels 3 hotels Within 1 km
  • B&B Hôtel 8 m
  • Hôtel Première Classe Montelimar Les Tourrettes 117 m
  • Hôtel Restaurant Campanile Montélimar - Les Tourrettes 130 m
Public toilets 1 public toilet Within 500 m
Parking areas 9 parking areas Within 300 m
Nearby stations

Other EV charging stations nearby

These nearby stations help compare distance, charge point count and available power levels around this location.

LA COUCOURDE VINCI

26740 La Coucourde

3.3 km
Charge points
12 charge points
Power levels
0 kW and 400 kW
Connectors
Type 2 Combo CCS CHAdeMO

Aire de la Coucourde A7 - 26740 LA COUCOURDE

View this station

FR*Y55

n/a

3.7 km
Charge points
2 charge points
Power
22 kW
Connectors
Type 2

Chemin des Granges, Saulce-sur-Rhône 26270 France

View this station
Territory

Local context

Charge points

Charge points attached to the station

12 technical charge point(s) are attached to this station.

Similar stations

Other comparable charging stations nearby

Nearby stations with a similar charging profile and local context.

FR*Y55

Saulce-sur-Rhône

3.7 km
22.00 kW
Explore

Continue browsing

Open related pages for this station: city, department or useful guides.

FAQ

Frequently asked questions

These answers help drivers prepare the charging stop before getting there.

What is the power of ENGIE Vianeo - B&B HOTEL MONTÉLIMAR NORD?

ENGIE Vianeo - B&B HOTEL MONTÉLIMAR NORD lists a maximum power of 22 kW. Compare this value with your vehicle, available time and battery level when planning the stop.

Which services are available near this charger?

The local context mentions Le Mas de Berianne Restaurant. These landmarks help plan a break, errand or meal while charging.

Is this station useful for charging aux Tourrettes?

Yes, the page brings together the main criteria for charging aux Tourrettes: power, access, address, map, nearby services and available charge points.

How should I prepare a stop at ENGIE Vianeo - B&B HOTEL MONTÉLIMAR NORD?

Before leaving, compare the advertised power, the number of charge points (12), access conditions and services around the station.