EV charging station
Operator Bouygues Energies & Services

EV charging station near Autoroute de Normandie in Morainvilliers

For charging in Morainvilliers, this station is not defined by power alone. Its proximity to Autoroute de Normandie ties it to a motorway corridor logic that may matter when choosing where to charge.

Accès libre Monday to Sunday 00:00-23:57 Autoroute de Normandie
Access

Before arriving

  • Accès libre
  • Monday to Sunday 00:00-23:57
  • Bank card payment not confirmed
Nearby

During the stop

  • 3 parking areas nearby
Context

Around the station

  • Useful for a route stop
  • Can fit a destination stop
  • Road access via Autoroute de Normandie
Overview

About this station

Around MORAINVILLIERS - Château, the presence of Autoroute de Normandie gives a more concrete view of the area. For many use cases, this motorway corridor context matters as much as the raw technical profile.

A maximum output of 22 kW makes it easier to compare this charging station with other nearby options.

For drivers, a charge stop connected to motorway corridor does not follow exactly the same logic as pure destination charging. This page is meant to make that difference more visible.

Local SEO

SEO summary

Summary
Services proches : 3 parkings. L acces routier principal le plus proche est a 955 m via Autoroute de Normandie.
Dominant context
mixed
SEO score
18.75
charging_station parking service_area camping motorway residential
Map

Location and access

The map helps locate the charger, nearby services and useful road access signals before the stop.

Directions

Open this station in a navigation app

Quickly start directions to the station with the navigation app you already use on the road.

Practical info

Power, access and usage

Maximum power 22 kW

Power helps estimate whether the charge is likely to be short, intermediate or longer depending on the vehicle.

Access Accès libre

The access information helps determine whether the charger is public, private or restricted.

Payment Yes

Payment information may vary by operator and by available source data.

Opening hours Monday to Sunday 00:00-23:57

Source opening hours are useful, but checking availability before a long trip is still recommended.

Accessible parking Accessible mais non réservé PMR

This data helps identify whether the location is suitable for drivers who need accessible access.

Address Rue du Centre 6, 78630 MORAINVILLIERS (BURE)

78630 Morainvilliers

Compatibility

Connector compatibility

This summary highlights the available connectors and payment methods while keeping the complete station information available below.

Suggested use

MORAINVILLIERS - Château fits a destination top-up use case. The accelerated charging profile should be compared with available time and nearby services.

Use case
service-area stop
Stop type
shopping or destination top-up
Indicative time
Charging for 1 to 3 hours may provide practical driving range

Available connectors

MORAINVILLIERS - Château lists Type 2. This setup generally corresponds to AC charging, to compare with the maximum power of 22 kW kW.

domestic socket Not indicated
Type 2 Available
Combo CCS Not indicated
CHAdeMO Not indicated
other connector Not indicated

Payment and reservation

A reservation requirement is indicated for this station. Before travelling, it is safer to check the exact process to avoid an unusable stop.

Pricing

Payment and reservation

Check the known payment methods, available prices and reservation conditions for this charging station.

Payment methods Pay-per-use charging

Free: No . Pay per use: Yes . Bank card: No . Other payment methods: No .

Reservation required Reservation required

The station record indicates that a reservation is required before charging.

Indicative pricing inferred from source text. Please verify with the operator.
Station data

Detailed station data

Identity

Station roaming ID
FRBE3E78431003
Developer
Communauté urbaine Grand Paris Seine & Oise
Source organization
alize

Access and usage

Installation type
Voirie
Source hours
Mo-Su 00:00-23:57
Size restriction
xx
Two-wheel vehicles
No
Connection type
Direct

Payment and connectors

Technical and source

Last update
2026-06-10
Last source modification
2026-06-10T12:31:43+02:00
Source dataset
64c28634468d0d94dd98405e
Source resource
5f29737c-5393-46f9-8140-2509992adc7a
Nearby services

What can you do while charging?

Nearby services make the stop easier to understand: food, shopping, parking or fuel services around the charger.

Parking areas 3 parking areas Within 300 m
Nearby stations

Other EV charging stations nearby

These nearby stations help compare distance, charge point count and available power levels around this location.

Marché Frais - Orgeval

78630 Orgeval

3.5 km
Charge points
5 charge points
Power levels
22 kW, 50 kW and 200 kW
Connectors
Type 2 Combo CCS CHAdeMO

988 Rte de Quarante Sous, 78630 Orgeval, France

View this station
Territory

Local context

Road access Autoroute de Normandie

955 m

D 113

1.3 km

Charge points

Charge points attached to the station

2 technical charge point(s) are attached to this station.

Similar stations

Other comparable charging stations nearby

Nearby stations with a similar charging profile and local context.

Explore

Continue browsing

Open related pages for this station: city, department or useful guides.

FAQ

Frequently asked questions

These answers help drivers prepare the charging stop before getting there.

What is the power of MORAINVILLIERS - Château?

MORAINVILLIERS - Château lists a maximum power of 22 kW. Compare this value with your vehicle, available time and battery level when planning the stop.

Which services are available near this charger?

The local context mentions nearby services. These landmarks help plan a break, errand or meal while charging.

Is this station useful for charging à Morainvilliers?

Yes, the page brings together the main criteria for charging à Morainvilliers: power, access, address, map, nearby services and available charge points.

How should I prepare a stop at MORAINVILLIERS - Château?

Before leaving, compare the advertised power, the number of charge points (2), access conditions and services around the station.