Before arriving
- Accès libre
- Monday to Sunday 00:00-23:57
- Bank card payment not confirmed
SAINT GERMAIN DU TEIL - Parking takes on a specific role in an environment shaped by motorway corridor. Being close to La Méridienne helps explain how charging may fit a practical use case on site.
The landmark La Méridienne places this station in a clearly readable motorway corridor context. That complements technical data by describing the immediate charging environment.
Actual charging speed depends on both the station's maximum power of 18 kW and your vehicle's capabilities.
For drivers, a charge stop connected to motorway corridor does not follow exactly the same logic as pure destination charging. This page is meant to make that difference more visible.
The map helps locate the charger, nearby services and useful road access signals before the stop.
Quickly start directions to the station with the navigation app you already use on the road.
Power helps estimate whether the charge is likely to be short, intermediate or longer depending on the vehicle.
The access information helps determine whether the charger is public, private or restricted.
Payment information may vary by operator and by available source data.
Source opening hours are useful, but checking availability before a long trip is still recommended.
This data helps identify whether the location is suitable for drivers who need accessible access.
48340 Saint-Germain-du-Teil
This summary highlights the available connectors and payment methods while keeping the complete station information available below.
Rather than a brief charging stop, SAINT GERMAIN DU TEIL - Parking is generally intended for longer parking periods. Charging time depends on the vehicle but often extends over several hours.
SAINT GERMAIN DU TEIL - Parking lists domestic socket and Type 2. This profile mainly fits AC charging, useful for a longer stop or a top-up depending on available power.
A reservation requirement is indicated for this station. Before travelling, it is safer to check the exact process to avoid an unusable stop.
Check the known payment methods, available prices and reservation conditions for this charging station.
Free: No . Pay per use: Yes . Bank card: No . Other payment methods: No .
The station record indicates that a reservation is required before charging.
Nearby services make the stop easier to understand: food, shopping, parking or fuel services around the charger.
These nearby stations help compare distance, charge point count and available power levels around this location.
n/a
1 La Mothe, Banassac-Canilhac 48500 France
View this station3 Avenue du Lot, La Canourgue 48500 France
View this station12560 Saint-Laurent-d'Olt
Rue Du Valt D'Olt, 12560 SAINT LAURENT D'OLT
View this station48500 La Canourgue
Chemin De La Bastide, 48500 LA CANOURGUE
View this station48100 Bourgs sur Colagne
Place De La Liberté, 48100 BOURG SUR COLAGNE (CHIRAC)
View this station48100 Marvejols
Le Pré De Suzon, 48100 MARVEJOLS
View this station48100 Marvejols
Place Du Barry, 48100 MARVEJOLS
View this station12560 Saint-Saturnin-de-Lenne
Pré de la Clastre , Saint Saturnin de Lenne 12560, 12560 Saint Saturnin de Lenne
View this station48230 Chanac
Allée du 19 Mars 1962, 48230 CHANAC
View this station858 residents
2.9 km
2 technical charge point(s) are attached to this station.
FRS48E481560011
FRS48E481560012
Nearby stations with a similar charging profile and local context.
Marvejols
La Canourgue
Bourgs sur Colagne
Open related pages for this station: city, department or useful guides.
These answers help drivers prepare the charging stop before getting there.
SAINT GERMAIN DU TEIL - Parking lists a maximum power of 18 kW. Compare this value with your vehicle, available time and battery level when planning the stop.
The local context mentions nearby services. These landmarks help plan a break, errand or meal while charging.
Yes, the page brings together the main criteria for charging à Saint-Germain-du-Teil: power, access, address, map, nearby services and available charge points.
Before leaving, compare the advertised power, the number of charge points (2), access conditions and services around the station.